发布时间:2023-09-28来源: 河南省住房和城乡建设厅
Catalogue of popularization of applicable technology for prefabricated buildings in Henan Province
(第一批)的公示
In order to implement the "Implementation Opinions of the General Office of the People's Government of Henan Province on Vigorously Developing prefabricated Buildings" (Henan Government Office [2017] No. 153), "Notice of Henan Province on Accelerating the Implementation of Opinions on Vigorously Developing prefabricated Buildings Support Policies" (Henan Construction Industry Regulation [2020] No. 5) and "Notice on Further Accelerating the Development of prefabricated Buildings" (Yu Jianke (20)22) 251) Spirit,Promote the application of the technical system, process method and parts of the prefabricated building in the construction project of our province,提升技术创新能力,促进装配式建筑产业发展,On the basis of public solicitation and voluntary declaration of enterprises,After form review, expert group review, field review and other processes,A total of 28 advanced and applicable technologies were selected as the "Promotion Catalogue of Applicable Technologies for Prefabricated Buildings in Henan Province (the first batch)" (see annex).。现予以公示。
一、公示时间
September 19, 2023 to September 26, 2023。
二、反映问题的形式
During the publicity period, any unit or individual can reflect the problems existing in the object of publicity to the Henan Provincial Department of Housing and Urban-Rural Development in writing through letters and visits。To reflect the problem in the name of the unit needs to stamp the official seal, to reflect the problem in the name of the individual needs to sign the real name and provide contact information。
三、联系地址和十大靠谱网投平台
Address: Henan Construction Technology and Talent Development Center (Room 1812, 18th Floor, West Tower, Henan Construction Building, No. 75 Zhengkai Avenue, Zhengdong New District, Zhengzhou City)
Contact: Guo Yubo Contact: 0371-66069623
Annex: Catalogue of Applicable Technologies for prefabricated buildings in Henan Province (the first batch)
2023年9月19日
附件
Promotion Catalogue of Applicable Technologies for prefabricated buildings in Henan Province (the first batch)
序号 | 类别 | 项目名称 | 技术体系简介 | 标准、图集、工法 | 适用范围 |
1 | 结构体系 | The technology of ring bar and anchor joint for prefabricated concrete shear wall structure | 装配式环筋扣合锚接The concrete shear wall structure consists of precast ring reinforced concrete inner wall, precast ring reinforced concrete outer wall, precast ring reinforced concrete stair and ring reinforced concrete laminated floor, which are assembled integrated concrete shear wall structure formed by the ring reinforcement anchorage connection technology。 | Technical standard for prefabricated ring-reinforced and anchored concrete shear wall structures JGJ/T430 | It is suitable for civil buildings in areas with seismic fortification intensity of 8 degrees and below。 |
2 | 结构体系 | 装配整体式叠合剪力墙结构技术 | The composite shear wall structure technology consists of composite wall panels and cast-in-place parts composed of precast concrete slabs and steel truss共同受力,进而形成的装配整体式叠合剪力墙结构。 | Technical Standard for Assembling monolithic superimposed shear wall structures DBJ41/T234 | It is suitable for civil buildings in areas with seismic fortification intensity of 8 degrees and below。 |
3 | 结构体系 | 灌芯装配式混凝土剪力墙结构技术 | The core prefabricated concrete shear wall structure technology is that most of the wall body and a small part of the edge members of the concrete shear wall are composed of precast concrete hollow shear walls,The longitudinal bearing bars of some edge members and the vertical distribution bars of the wall depth are connected in the hollow hole,Both horizontal and vertical directions are connected by cast-in-place concrete joints,对空心剪力墙部分的空洞进行灌芯,使结构构件形成整体。 | Technical Standard for Assembled monolithic concrete shear Wall structures DB13(J)/T 8415 Code for Design of prefabricated shear wall structures DB11/1003 | It is suitable for residential buildings in areas with seismic fortification intensity of 8 degrees and below。 |
4 | 结构体系 | EVE prefabricated hollow slab superimposed shear wall structure technology | EVEThe prefabricated hollow slab superimposed shear wall structure technology is the structural lateral force resistance of the superimposed shear wall formed by precast concrete hollow wall slab and in-situ pouring concrete in the hole of the wall slab构件 | Technical Code for prefabricated hollow slab superimposed shear wall structures T/CECS 915 | It is suitable for residential buildings in areas with seismic fortification intensity of 8 degrees and below。 |
5 | 结构体系 | 装配整体式钢筋焊接网叠合结构技术 | 装配整体式钢筋焊接网叠合结构The technology is composed of the composite members of the formed steel cage and the precast wall panel, which bear the load together by the tie piece and the cast-in-place concrete。 | Technical Code for the Assembly of welded mesh laminated concrete Structures for monolithic Rebar T/CECS 579 Technical specification for Waterproofing of underground engineering of Assembled monolithic superimposed Concrete Structures T/CECS 832 Code for Construction and Quality Acceptance of Assembled monolithic superimposed Concrete Structures T/CECS 1180 | It is suitable for civil buildings in areas with seismic fortification intensity of 6~8 degrees。 |
6 | 结构体系 | EMC装配式混凝土结构技术 | EMC装配式混凝土结构技术是指The composite shear wall with vertical holes is formed by metal bellows inside the prefabricated hollow composite wall panel、The vertical longitudinal ribs in the upper and lower wall panels are connected in corrugated tubes、Concrete is poured behind the corrugated tube to realize the overall force。 | 《Technical Code for prefabricated superimposed concrete Structures T/CECS 1336 | 适用于抗震设防烈度为6~8度地区的民用建筑。 |
7 | 结构体系 | Technology of concrete shear wall structure with composite formwork shell system | The concrete shear wall structure technology of assembling composite form shell system is a concrete shear wall formed after the form shell system is installed on the construction site and concrete is poured in the form shell。 | Technical Code for concrete shear wall Structures with Composite formwork System T/CECS 522 | It is suitable for civil buildings in areas with seismic fortification intensity of 8 degrees and below。 |
8 | 结构体系 | PHF建筑体系(免支撑钢混框架结构技术) | PHF construction system is a new type of structure system composed of precast concrete frame column, precast concrete frame beam and steel end, wherein the steel end consists of steel structure segment, binding segment and shear peg。 | Technical Code for fabricated Steel Joint Mixed Frame Structures T/CECS1354 Technical Code for prefabricated multistory concrete Structures T/CECS 604 | It is suitable for low and multi-storey civil buildings with seismic fortification intensity of 8 degrees and below in areas with building height below 18 meters。 |
9 | 结构体系 | 装配式劲性柱混合梁框架结构技术 | 装配式劲性柱混合梁框架结构技术It is mainly composed of concrete-filled steel tube columns (rigid columns) with outlying concrete, reinforced concrete beams (mixed beams) with I-shaped steel joints embedded at both ends and laminated floor slabsIt is connected by a reliable connection method and forms an integrated integrated frame structure with the on-site post-cast concrete。 | Technical Code for prefabricated composite beam frame structures JGJ/T 400 | It is suitable for multi-storey and high-rise civil buildings with seismic fortification intensity of 8 degrees and below。 |
10 | 结构体系 | 装配式钢-混搭阶建筑结构技术 | 钢-混搭阶建筑结构技术是由The beam-column joints are connected by new type of step-type full bolts. 楼板采用全预制整体楼板、套筒与栓钉组合连接,The exterior wall and the inner partition wall are made of fully prefabricated wide-body wall panels, and the kitchen and bathroom are integrated as a whole等技术集成的钢结构体系。 | 《十大网投在线入口》GB50017 Technical Specification for high-strength bolted connection of Steel StructuresJGJ 82 《十大靠谱网投平台》GB 50205 《十大靠谱网投平台》GB 55006 | It is suitable for civil buildings and industrial buildings in areas with seismic fortification intensity of 8 degrees and below。 |
11 | 结构体系 | 装配式钢节点混合框架结构技术 | 装配式钢节点混合框架结构技术It is a connection node in a precast concrete beam and a precast concrete column采用The steel connection head is a structural system in which the beam is connected with the column and the upper and lower columns are connected by connecting the steel connection head。 | 《Technical specification for prefabricated steel joint mixed frame structures》T/CECS 1354 | It is suitable for civil buildings in areas with seismic fortification intensity of 8 degrees and below。 |
12 | 结构体系 | 部分包覆钢-混凝土组合结构技术 | The technology of partially clad steel-concrete composite structure is composed of the main steel parts of the open section and the concrete poured within the outer profile,A new steel-concrete composite structure can be formed by installing steel accessories such as longitudinal bars, stirrups, shear parts and connecting rods in concrete,It includes PEC steel-mixed composite column, PEC steel-mixed composite beam and PEC steel-mixed composite shear wall。 | 《Technical Code for Partially clad steel-concrete Composite Structures T/CECS 719 | It is suitable for civil buildings in areas with seismic fortification intensity of 8 degrees and below。 |
13 | 结构体系 | 装配式固模剪力墙及楼承板结构技术 | 固The modular shear wall structure technology includes "precast concrete hollow wall solid mold" as a wall solid mold and "light steel frame concrete plate" as a floor solid mold. The solid mold is a non-demolition prefabricated part that acts as a template when the wall or floor concrete is poured。 | 《Technical specification for fixed mold shear wall structures T/CECS 283 Technical Standard for prefabricated fixed mold shear Wall and Floor Plate structures DB13(J)/T 8398 | It is suitable for civil buildings in areas with seismic fortification intensity of 8 degrees and below。 |
14 | 结构体系 | 钢-混凝土组合管剪力墙结构技术 | The steel concrete composite pipe shear wall structure technology is a lateral force resistant structural member formed by the precast member composed of steel composite pipe and concrete outside the pipe and the inner concrete poured in situ。 | 《Technical Code for Steel-concrete composite pipe structures T/CECS 1059 | It is suitable for new and expanded industrial and civil buildings in areas with seismic fortification intensity of 8 degrees and below。 |
15 | 结构体系 | Bolt-connected multi-layer fully fabricated concrete wall panel structure technology | Bolted multi-storey fully fabricated concrete wall panel structure技术是由预制混凝土The wall panels are used as vertical load-bearing and lateral force resistant components, the prefabricated floor slabs are used as floor covers, and the prefabricated components are connected by embedded sleeves and connecting boxes或连接锚板、螺栓连接形成的多层墙板结构体系。 | Technical Code for bolted multistory fully prefabricated concrete wall panel structures T/CECS 809 | It is suitable for multi-storey civil buildings with seismic fortification intensity of 6 to 8 degrees。 |
16 | 结构体系 | 高层装配式钢框架偏心支撑结构技术 | 高层装配式钢框架偏心支撑结构The technology is a steel frame in which the working lines of the supporting frame members do not converge at one point, the eccentricity of the supporting connection point is greater than the width of the minimum member at the connection point, and the energy dissipation beam section consumes energy-偏心支撑结构技术。 |
《十大网投在线入口》GB50017 Technical Code for Steel Structure of high-rise Civil Building JGJ99 "Steel structure engineering construction quality inspection Standard" GB 50205 | It is suitable for civil buildings with building height of 80~100 meters and seismic fortification intensity of 8 degrees and below。 |
17 | 结构体系 | 装配式空腹排柱钢结构住宅技术 | The prefabricated hollow column steel structure housing technology is that the main structure is composed of hollow column, H-shaped steel beam, steel support or steel plate shear wall,The floor panels are fabricated steel truss floor plates with reusable formwork,内隔墙采用轻质复合条板,The exterior wall adopts the integration technology of lightweight strip board and assembled thermal insulation decorative board。 | Code for the Design of Composite Structures JGJ 138 "Steel structure design Standard" GB 50017 "Steel structure engineering construction quality inspection Standard" GB 50205 | It is suitable for residential buildings with seismic fortification intensity of 8 degrees and below。 |
18 | 结构体系 | 分层装配支撑钢框架房屋技术 | 分层装配支撑钢框架房屋技术是The support is the main side force resistance component, the beam through, the column layer, the beam column adopts the whole bolt connection, and the structure system is assembled by layers of steel structure system。 | Technical Code for laminated erection of steel frame Houses T/CECS 598 | It is suitable for civil buildings with 6 floors and below in areas with seismic fortification intensity of 8 degrees and below 8 degrees。 |
19 | 结构体系 | Construction technology of low prefabricated steel structure with cluster G section steel | The construction technology of low-rise prefabricated steel structure is that the beam, column and shear wall members are composed of multiple thickened complex flanged steel (cluster G steel),And the joint with the standard steel structure constitutes the main lateral force resistance structural member of the low-rise steel structure building,楼板采用钢筋桁架楼承板,The outer protection adopts prefabricated light wall panel;The interior decoration adopts integrated technology such as assembly decoration。 | Steel structure design Standard GB50017 Technical Specification for cold-formed thin-wall steel structure GB50018 "Cold Forming Steel with complex edging" T/CECS 10146 | It is suitable for low-rise civil buildings with three floors and below three floors in areas with seismic fortification intensity of 8 degrees and below 8 degrees。 |
20 | 结构体系 | Easy construction rectangular steel pipe column steel structure frame-stiffened perforated steel plate shear wall technical system | The main structure of the rectangular steel pipe column steel frame-stiffened perforated steel plate shear wall system is steel frame + ductile wall panel structure. The steel frame is composed of rectangular steel pipe and double web H-shaped steel column, which is filled with concrete and mainly bears vertical load.The steel beam is made of narrow flange H-shaped steel。The supporting structure adopts ductile wall panel structure, and the ductile wall panel mainly adopts stiffened perforated steel plate shear wall, which mainly bears horizontal load。The floor slab is made of cast-in-place concrete composite floor slab with removable bottom mold steel column.The outer retaining wall adopts prefabricated AAC wall panel and metal curtain wall panel.The inner partition wall adopts AAC wall panel。Integrated enclosure, internal installation system, the realization of building hidden beam hidden column。 | "Steel structure design Standard" GB 50017 Technical Code for rectangular concrete-filled Steel Tube structures CECS 159 Technical Code for Steel Structures in high-rise Civil Buildings JGJ 99 Technical specification for concrete-filled steel Tube structure GB 50936 "Steel structure engineering construction quality acceptance Standard" GB50205 | 适用于抗震设防烈度为8度及8度以下地区的民用建筑。 |
21 | 结构体系 | 装配式混凝土结构地下车库技术 | Prefabricated concrete structure underground garage technology is composed of precast concrete components through reliable connection to assemble into a whole ordinary underground or semi-underground garage。 | Technical Standard for prefabricated Concrete Structure Underground Garage DB37/T 5199 | 适For the seismic fortification intensity of 8 degrees and below 8 degrees of independent construction of underground garage。 |
22 | 结构体系 | 集成装配式多层房屋技术 | 集成装配式多层房屋技术是Concrete structural layer and protective layer are simultaneously poured on both sides of the thermal insulation layer in the factory的墙板The floor slab forms the basic module and the basic module is assembled on site而成的结构技术。 | Technical Code for Low Energy Consumption integrated prefabricated multi-storey Buildings T/CECS 1256 "RQB Steel wire mesh composite insulation board cast-in-place Concrete wall self-insulation system application technical regulations" T/YCST 009 | It is suitable for multi-storey civil buildings with seismic fortification intensity of 8 degrees and below 8 degrees and the number of floors is not more than 6 layers and the height is not more than 24 meters。 |
23 | 部品部件 | 装配式钢结构集成楼盖 | 装配式钢结构集成楼盖是指The steel structure trusses of integrated water supply and drainage, electrical, HVAC, fire fighting and other pipelines and equipment, which are produced in the factory and hoisted on the site as a whole, are combined with reinforced concrete floors, building surfaces and fireproof ceilings。 | "Technical Standard for Application of fabricated Steel Structure Integrated floor" DBJ41/T277 | It is suitable for industrial and civil buildings in areas with seismic fortification intensity of 8 degrees and below。 |
24 | 部品部件 | 钢管桁架预应力混凝土叠合板 | The prestressed concrete composite slab of steel tube truss is a floor slab formed by the combination of grouting steel tube truss and prestressed concrete bottom plate and the composite layer of in-situ poured concrete。 | Technical specification for prestressed concrete Composite panels for steel tube trusses T/CECS 722 | 抗震设防烈度为8度及8度以下The environmental categories are Class I and Class 2A civil and industrial buildings。 |
25 | 部品部件 | 边缘叠合楼板 | The edge laminated floor is that most of the concrete of the floor members is poured in the factory, only a partial laminated layer is reserved around the floor, and additional steel bars are placed after the floor members are placed and then partially laminated to form a whole。 | 《十大网投在线入口》GB 50010 Code for Construction Quality Acceptance of Concrete Structure EngineeringGB 50204 | It is suitable for general industrial and civil buildings with seismic fortification intensity not higher than 8 degrees。 |
26 | 围护系统 | 钢板网构复合保温混凝土墙板技术 | 钢板网构复合保温混凝土墙板Is the use of steel mesh as a support, connected concrete, aluminum plated zinc magnesium decorative panel components, industrial production in the factory through special production technology, the middle cavity filled with insulation materials, composite with insulation decoration integration of the wall panel。 | Technical Regulations for the Application of Steel mesh composite insulation Concrete Wallboard T/CREA 004 | 适用于抗震设防烈度8度及8度以下地区民用建筑的围护系统。 |
27 | 装修系统 | 装配式内装整体厨卫 | 装配式整体卫生间是It is composed of waterproof chassis, top plate, siding and supporting keel, and is compatible with variousBathroom module formed by combination of sanitary ware and functional accessories。The assembled integrated kitchen is composed of raised floor + composite wall panel + integrated ceiling, and the kitchen mold is formed by reliable connecting pieces块的厨房。 | Technical standard for the application of prefabricated integral toilet JGJ/T 467 Technical standard for the application of prefabricated integral kitchens JGJ/T 477 | 适用于工业与民用建筑的厨卫。 |
28 | 装修系统 | 轻晶石轻钢集成外挂墙板 | 装配式轻晶石轻钢集成外挂墙板是Using cold-formed thin-wall steel and light SPAR as main materials, the grouting was carried out by opening channel将Light crystal, cold-formed thin-wall steel, steel mesh and other materials integration且The integrated wall is made in the factory to meet the functional requirements of architectural design幕墙。 | 《十大靠谱网投平台》JGT 506 《十大靠谱网投平台》GB 50574 《十大网投在线入口》GB/T 21086 《十大网投在线入口》JGJ 133 | It is suitable for curtain wall systems of industrial and civil buildings in areas with seismic fortification intensity of 8 degrees and below。 |
Henan Civil Architecture Society is a provincial, public welfare, professional and non-profit scientific and technological academic social organization voluntarily established by scientific and technological workers in the field of civil construction and relevant units in Henan province, approved by the provincial Civil Affairs Department and registered,Have independent legal personality;The competent unit shall be Science and Technology Association of Henan Province,接受省民政厅监督管理,In business, we accept the guidance of China Civil Engineering Society, China Architectural Society and Henan Provincial Department of Housing and Urban-Rural Development。
联系人:张苗子
Contact number: 0371-63934798
QQ:2078961585
Email: 2078961585@qq.com
联系地址:郑州市黄河路96号